Overview
Milleen Constructions was engaged to deliver the civil concrete works for a 12 megalitre clearwater reservoir at Anna Bay. The reservoir forms part of critical regional infrastructure to strengthen water supply and security for the Port Stephens community.
Scope of Works
- Precast concrete panel fabrication and installation
- Reinforced base slab construction
- Wall erection and structural integration
- Coordination of heavy lifting operations for panel placement
- Civil works and finishing for long-term durability and performance
Outcome
The project required precision engineering, careful sequencing, and strict quality control to achieve a watertight and structurally robust reservoir. Milleen Constructions successfully delivered the package on time and to specification, ensuring the long-term resilience of local water infrastructure.