2013
Share this project
PWCS Floodplain Outlet Structure
2015
Sandvik – Manufacturing Facility Upgrade
2025
Vales Point Power Station – Fly Ash Pumping Station
2017
TL Line 24 STR 39, 40, 41 & 42 Cruciform
2021
Orica KI – Arsenic Capping & Remediation
2019
Centennial Coal – Mandalong Power Station (WCMG)
2020
Tank Industries PWCS Tank Bases
2017 and 2021
Xstrata Ravensworth North Expansion
2012
Mt Lock Wind Farm Switching Station
Infrabuild Newcastle East Mill Upgrade
Smeaton Grange – AWS Data Centre Substation & Associated Switching Station
Parramatta River Boardwalk Pile Driving
Sapphire Wind Farm 330kV S/Station Bulk Earthworks & Drainage
Anna Bay 12ML Clearwater Reservoir
2010
CPP Newcastle 330kV Substation Rebuild
Orica Demin Bund
Onesteel Rooty Hill Detention Tank
2016
Mandalong Transmission Line 24 Cruciform Footings
Dungog Water Treatment Plant – Reservoir Construction
PWCS Pond Revetment Works
Orica Prill Tower Emissions Abatement Scheme
2023
Orica Nitric Acid Plant Tertiary Abatement Scheme
Orica Ammonia Plant High Temperature Shift (HTS)
Bango Wind Farm Harmonic Filter Bay
Infrabuild Newcastle – Mesh Manufacturing Facility
Mt Pleasant Train Load Out
Tomago 9C6 Wooden Pole Replacement
Orica KI NAP1 Stack Replacement
Mandalong TL24 Deviation
2018
Waratah Super Battery Transmission Line
2024
Stockdill Substation VNI Upgrade
Jemalong Solar Farm Substation & Civil Works
The Eraring Battery Energy Storage System OHTL
Culcairn TL footings
Incitec
Eraring Battery Energy Storage System (BESS)